Industrial Projects

Production Building and Addition
Kottler Metal Products
Willoughby, Ohio
Production facility for rolled and fabricated steel. The total building is 750 feet long and 80 feet wide.  There are two crane aisles using a 10 Ton and 5 Ton underhung bridge crane in each aisle.

 

Building Additions and Equipment Installation
Allen Sugar
Cleveland, Ohio
Process layout and building revisions to install various material (granulated sugar) throughout the plant.  Typical equipment included: bucket elevators, silos, hoppers and screw conveyors.

 

Best Sands Corporation
Chardon, Ohio
Installation of two screening towers, oversize separation system, magnetic separation plant, and stockpile system.  Structural work included 4 buildings (housing equipment); twenty silo foundations, six conveyor foundations, three transfer towers and elevated radial conveyor runway.

 

1500 Ton Stamping Press Installation
Solartec Corporation
Salem, Ohio
Provided the structural engineering for a pile supported pit foundation for a 1500 Ton capacity stamping press.

 

MPW/Vinewood
Cleveland, Ohio
Building addition for storage of finished products.  Building is 200 feet by 200 feet with only one interior column.

 

Shalmet Ohio
Elyria, Ohio
Construction of two bay crane building for processing bar stock.  Building is 120 feet wide by 400 feet long.

 

Stamco Industries
Euclid, Ohio
Construction of 1000 ton press addition.  Building designed to support three different cranes in three different aisles.  Building is 140 feet wide by 210 feet long.

 

Presrite Corporation
Cleveland, Ohio
Construction of a steel bar storage facility using a pre-engineered building system.  Two 10-Ton cranes were included in the building.

 

Metal Processing Corporation
Bedford, Ohio
Installation of pickling tanks for coil bar stock and crane runway extension in existing mill building.

 

Empire Die Cast
Macedonia, Ohio
Building expansion of 200,000 SF to include new die casting furnaces, finishing equipment, storage, and shipping areas.  All structural steel building.  Project included crane layouts and specifications.

 

Wet Sand Screening Towers
LPT Group
Various Locations

Design of three sand screening towers using wet-process.  The towers had footprints of 20 feet by 20 feet and varied in height from 30 feet to fifty feet.  All the towers included multiple platform levels and access stairs.  All towers were designed using structural steel.

 

Continuous Mold Making Structure
Alliance Castings
EMI Corporation

Modifications to an existing building as well as added additional structures and platforms to support the sand system for a continuous foundry mold making process.   A work platform, designed for 250 PSF live load was part of the project.  The structure was designed using structural steel.